Dunlop Purofort Thermo+ full safety

Dunlop Winter Safety Boots

Manufacturer Name and Code: Dunlop Purofort Thermo+ Full Safety C662933

Bylsma Imports Product Code: WBS

Manufacturer Name and Code: Dunlop Purofort

Thermo+ Full Safety C662933

Bylsma Imports Product Code: WBS

Product Description
Dunlop Winter Safety Boots are a fully waterproof winter work boot. They have a high traction slip resistant sole and a safety toe cap and plate. Additionally, they are insulated for temperatures as low as -50˚C, ensuring your feet are dry, clean, safe, and warm throughout the coldest winter days. Contact us for purchasing options.

Color: dark green upper, black sole

Product Specifics
  • Insulation down to -50℃
  • Steel toe and puncture-resistant plate; steel midsole
  • Flexible, waterproof Purofort® upper
  • Ultra light for comfortable use all day long
  • Resistant against manure, chemicals, oils and fats
  • High traction and slip resistant outsole for protection under cold conditions (SRC Certified)
  • Antistatic and excellent shock absorption
  • Removable and replaceable ergonomic insole
Size

Sizes Available:

US 6 – US 15   /   EU 37/38 – EU 48

winter boot Dunlop size chart